US Bridges

FM 971 over Draw

Fair

Williamson County, Texas · 2.60 MI E of SH 95 · Structure no. 142460120202016

Built
1978
47 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
219 ft
5 main spans
Daily traffic
639
2023 count
Owner
State
State Highway Agency

About this bridge

FM 971 over Draw is a concrete stringer/multi-beam or girder carrying FM 971 over Draw in Williamson County, Texas. It was built in 1978, so it is 47 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 639 vehicles a day, roughly 14% of them trucks, projected to reach 578 by 2041. The structure is 219 ft (66.8 m) long and 42 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesFM 971
CrossesDraw
Location2.60 MI E of SH 95
RouteState Highway 971
StateTexas
Coordinates30.72658, -97.40213
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length219 ft (66.8 m)
Longest span44 ft (13.4 m)
Deck width42 ft (12.9 m)
Roadway width41 ft (12.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic639 (2023)
Projected traffic578 by 2041
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 971 over Draw built?

It was built in 1978, making it 47 years old in 2025.

What condition is FM 971 over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does FM 971 over Draw carry?

About 639 vehicles per day (2023 count), of which roughly 14% are trucks.

How long is FM 971 over Draw?

The structure is 219 ft (66.8 m) long with a longest span of 44 ft (13.4 m) and a deck 42 ft wide.

Who owns FM 971 over Draw?

It is owned by the State Highway Agency.