FM 619 over Draw
PoorClosed to trafficWilliamson County, Texas · 0.45 MI S of FM 112 · Structure no. 142460098601007
- Built
- 1935
- 90 years old, rebuilt 1960
- Condition
- Poor
- inspected March 2023
- Type
- Culvert
- Concrete
- Length
- 34 ft
- 5 main spans
- Daily traffic
- 1,224
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 619 over Draw is a concrete culvert carrying FM 619 over Draw in Williamson County, Texas. It was built in 1935 and reconstructed in 1960, so it is 90 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 1,224 vehicles a day, roughly 9% of them trucks, projected to reach 1,496 by 2039. The structure is 34 ft (10.4 m) long and 42 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 619 over Draw built?
It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1960.
What condition is FM 619 over Draw in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2023.
How much traffic does FM 619 over Draw carry?
About 1,224 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is FM 619 over Draw?
The structure is 34 ft (10.4 m) long with a longest span of 6 ft (1.8 m) and a deck 42 ft wide.
Who owns FM 619 over Draw?
It is owned by the State Highway Agency.