SH45EB to LP1SB over Mcneil RD & UP RR
GoodWilliamson County, Texas · 2.3 MI E of RM 620 · Structure no. 142460068306132
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 4,916 ft
- 3 main spans
- Daily traffic
- 18,000
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SH45EB to LP1SB over Mcneil RD & UP RR is a steel continuous stringer/multi-beam or girder carrying SH45EB to LP1SB over Mcneil RD & UP RR in Williamson County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,000 vehicles a day, roughly 15% of them trucks, projected to reach 31,850 by 2033. The structure is 4,916 ft (1,498.4 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH45EB to LP1SB over Mcneil RD & UP RR built?
It was built in 2006, making it 19 years old in 2025.
What condition is SH45EB to LP1SB over Mcneil RD & UP RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does SH45EB to LP1SB over Mcneil RD & UP RR carry?
About 18,000 vehicles per day (2013 count), of which roughly 15% are trucks.
How long is SH45EB to LP1SB over Mcneil RD & UP RR?
The structure is 4,916 ft (1,498.4 m) long with a longest span of 224 ft (68.3 m) and a deck 38 ft wide.
Who owns SH45EB to LP1SB over Mcneil RD & UP RR?
It is owned by the State Highway Agency.