LP1NB to SH45EB over SH 45 EB FR
GoodWilliamson County, Texas · 2.7 MI E of RM 620 · Structure no. 142460068306131
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,875 ft
- 25 main spans
- Daily traffic
- 18,000
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
LP1NB to SH45EB over SH 45 EB FR is a prestressed concrete stringer/multi-beam or girder carrying LP1NB to SH45EB over SH 45 EB FR in Williamson County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,000 vehicles a day, roughly 15% of them trucks, projected to reach 29,190 by 2033. The structure is 2,875 ft (876.3 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was LP1NB to SH45EB over SH 45 EB FR built?
It was built in 2006, making it 19 years old in 2025.
What condition is LP1NB to SH45EB over SH 45 EB FR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does LP1NB to SH45EB over SH 45 EB FR carry?
About 18,000 vehicles per day (2013 count), of which roughly 15% are trucks.
How long is LP1NB to SH45EB over SH 45 EB FR?
The structure is 2,875 ft (876.3 m) long with a longest span of 123 ft (37.5 m) and a deck 38 ft wide.
Who owns LP1NB to SH45EB over SH 45 EB FR?
It is owned by the State Highway Agency.