US Bridges

SH45EB to IH35NB over SH 45 & IH 35

Good

Williamson County, Texas · 0.7 MI E of FM 1325 · Structure no. 142460068306041

Built
2006
19 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,050 ft
4 main spans
Daily traffic
18,000
2013 count
Owner
State
State Highway Agency

About this bridge

SH45EB to IH35NB over SH 45 & IH 35 is a steel continuous stringer/multi-beam or girder carrying SH45EB to IH35NB over SH 45 & IH 35 in Williamson County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,000 vehicles a day, roughly 15% of them trucks, projected to reach 28,040 by 2033. The structure is 1,050 ft (320 m) long and 38 ft wide.

CarriesSH45EB to IH35NB
CrossesSH 45 & IH 35
Location0.7 MI E of FM 1325
RouteState Highway 45
StateTexas
Coordinates30.47991, -97.67607
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4 (+1 approach)
Design loadHS 20
Structure length1,050 ft (320 m)
Longest span254 ft (77.4 m)
Deck width38 ft (11.6 m)
Roadway width35 ft (10.7 m)
Vertical clearance over deck19 ft (5.8 m)

Traffic and service

Average daily traffic18,000 (2013)
Projected traffic28,040 by 2033
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH45EB to IH35NB over SH 45 & IH 35 built?

It was built in 2006, making it 19 years old in 2025.

What condition is SH45EB to IH35NB over SH 45 & IH 35 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SH45EB to IH35NB over SH 45 & IH 35 carry?

About 18,000 vehicles per day (2013 count), of which roughly 15% are trucks.

How long is SH45EB to IH35NB over SH 45 & IH 35?

The structure is 1,050 ft (320 m) long with a longest span of 254 ft (77.4 m) and a deck 38 ft wide.

Who owns SH45EB to IH35NB over SH 45 & IH 35?

It is owned by the State Highway Agency.