US Bridges

RM 620 WB over SH 45 WB on Ramp

Good

Williamson County, Texas · 1.5 MI E of US 183 · Structure no. 142460068301481

Built
2007
18 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
575 ft
5 main spans
Daily traffic
18,000
2013 count
Owner
State
State Highway Agency

About this bridge

RM 620 WB over SH 45 WB on Ramp is a prestressed concrete stringer/multi-beam or girder carrying RM 620 WB over SH 45 WB on Ramp in Williamson County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,000 vehicles a day, roughly 15% of them trucks, projected to reach 22,510 by 2033. The structure is 575 ft (175.3 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRM 620 WB
CrossesSH 45 WB on Ramp
Location1.5 MI E of US 183
RouteState Highway 620
StateTexas
Coordinates30.47538, -97.77026
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length575 ft (175.3 m)
Longest span120 ft (36.6 m)
Deck width26 ft (7.9 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,000 (2013)
Projected traffic22,510 by 2033
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was RM 620 WB over SH 45 WB on Ramp built?

It was built in 2007, making it 18 years old in 2025.

What condition is RM 620 WB over SH 45 WB on Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does RM 620 WB over SH 45 WB on Ramp carry?

About 18,000 vehicles per day (2013 count), of which roughly 15% are trucks.

How long is RM 620 WB over SH 45 WB on Ramp?

The structure is 575 ft (175.3 m) long with a longest span of 120 ft (36.6 m) and a deck 26 ft wide.

Who owns RM 620 WB over SH 45 WB on Ramp?

It is owned by the State Highway Agency.