US Bridges

SH 130 over Draw

Good

Williamson County, Texas · 1.10 MI S of SH 29 · Structure no. 142460044005036

Built
2006
19 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
31 ft
3 main spans
Daily traffic
6,400
2016 count
Owner
State
State Highway Agency

About this bridge

SH 130 over Draw is a concrete culvert carrying SH 130 over Draw in Williamson County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,400 vehicles a day, roughly 15% of them trucks, projected to reach 30,000 by 2036. The structure is 31 ft (9.4 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSH 130
CrossesDraw
Location1.10 MI S of SH 29
StateTexas
Coordinates30.62688, -97.62525
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length31 ft (9.4 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,400 (2016)
Projected traffic30,000 by 2036
Trucks15%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 130 over Draw built?

It was built in 2006, making it 19 years old in 2025.

What condition is SH 130 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SH 130 over Draw carry?

About 6,400 vehicles per day (2016 count), of which roughly 15% are trucks.

How long is SH 130 over Draw?

The structure is 31 ft (9.4 m) long with a longest span of 8 ft (2.4 m).

Who owns SH 130 over Draw?

It is owned by the State Highway Agency.