SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr
GoodWilliamson County, Texas · 3.30 MI N of SH 29 · Structure no. 142460044005022
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,920 ft
- 16 main spans
- Daily traffic
- 10,000
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr is a prestressed concrete stringer/multi-beam or girder carrying SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr in Williamson County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,000 vehicles a day, roughly 15% of them trucks, projected to reach 12,201 by 2036. The structure is 1,920 ft (585.2 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr built?
It was built in 2006, making it 19 years old in 2025.
What condition is SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr carry?
About 10,000 vehicles per day (2016 count), of which roughly 15% are trucks.
How long is SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr?
The structure is 1,920 ft (585.2 m) long with a longest span of 135 ft (41.1 m) and a deck 38 ft wide.
Who owns SH130NB to IH 35NB over IH 35 Nbfr & SH 130 Nbfr?
It is owned by the State Highway Agency.