SH 195 Loop Ramp B over South Salado Creek
GoodWilliamson County, Texas · 0.02 MI E of SH 195 Bus · Structure no. 142460044001246
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected January 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 400 ft
- 8 main spans
- Daily traffic
- 1,654
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 195 Loop Ramp B over South Salado Creek is a prestressed concrete box beam or girders - multiple carrying SH 195 Loop Ramp B over South Salado Creek in Williamson County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,654 vehicles a day, roughly 12% of them trucks, projected to reach 500 by 2032. The structure is 400 ft (121.9 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 195 Loop Ramp B over South Salado Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is SH 195 Loop Ramp B over South Salado Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does SH 195 Loop Ramp B over South Salado Creek carry?
About 1,654 vehicles per day (2020 count), of which roughly 12% are trucks.
How long is SH 195 Loop Ramp B over South Salado Creek?
The structure is 400 ft (121.9 m) long with a longest span of 50 ft (15.2 m) and a deck 46 ft wide.
Who owns SH 195 Loop Ramp B over South Salado Creek?
It is owned by the State Highway Agency.