SH 29 over San Gabriel River
FairWilliamson County, Texas · 6.30 MI E of IH 35 · Structure no. 142460033702023
- Built
- 1959
- 66 years old, rebuilt 1993
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 590 ft
- 3 main spans
- Daily traffic
- 8,048
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
SH 29 over San Gabriel River is a steel continuous stringer/multi-beam or girder carrying SH 29 over San Gabriel River in Williamson County, Texas. It was built in 1959 and reconstructed in 1993, so it is 66 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,048 vehicles a day, roughly 5% of them trucks, projected to reach 10,462 by 2039. The structure is 590 ft (179.8 m) long and 46 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 29 over San Gabriel River built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1993.
What condition is SH 29 over San Gabriel River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does SH 29 over San Gabriel River carry?
About 8,048 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is SH 29 over San Gabriel River?
The structure is 590 ft (179.8 m) long with a longest span of 90 ft (27.4 m) and a deck 46 ft wide.
Who owns SH 29 over San Gabriel River?
It is owned by the State Highway Agency.