US Bridges

US 79 over Drainage Ditch

Fair

Williamson County, Texas · 3.35 MI E of FM 619 · Structure no. 142460020404016

Built
1923
102 years old, rebuilt 2009
Condition
Fair
inspected March 2023
Type
Culvert
Concrete
Length
24 ft
2 main spans
Daily traffic
10,902
2021 count
Owner
State
State Highway Agency

About this bridge

US 79 over Drainage Ditch is a concrete culvert carrying US 79 over Drainage Ditch in Williamson County, Texas. It was built in 1923 and reconstructed in 2009, so it is 102 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,902 vehicles a day, roughly 12% of them trucks, projected to reach 15,263 by 2041. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 79
CrossesDrainage Ditch
Location3.35 MI E of FM 619
RouteU.S. Route 79
StateTexas
Coordinates30.58626, -97.32218
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length24 ft (7.3 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,902 (2021)
Projected traffic15,263 by 2041
Trucks12%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$3,000
NavigationNo navigation control on waterway

Frequently asked questions

When was US 79 over Drainage Ditch built?

It was built in 1923, making it 102 years old in 2025. It was reconstructed in 2009.

What condition is US 79 over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does US 79 over Drainage Ditch carry?

About 10,902 vehicles per day (2021 count), of which roughly 12% are trucks.

How long is US 79 over Drainage Ditch?

The structure is 24 ft (7.3 m) long with a longest span of 10 ft (3 m).

Who owns US 79 over Drainage Ditch?

It is owned by the State Highway Agency.