US Bridges

N IH 35 on Ramp over UPRR & Mcneil RD

Good

Williamson County, Texas · 1.1 MI S of US 79 · Structure no. 142460001509682

Built
2018
7 years old
Condition
Good
inspected February 2023
Type
Other
Concrete Continuous
Length
2,094 ft
1 main span
Daily traffic
207,900
2019 count
Owner
State
State Highway Agency

About this bridge

N IH 35 on Ramp over UPRR & Mcneil RD is a concrete continuous other carrying N IH 35 on Ramp over UPRR & Mcneil RD in Williamson County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 207,900 vehicles a day, projected to reach 1 by 1900. The structure is 2,094 ft (638.3 m) long and 26 ft wide.

CarriesN IH 35 on Ramp
CrossesUPRR & Mcneil RD
Location1.1 MI S of US 79
RouteInterstate 35
StateTexas
Coordinates30.49833, -97.68026
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans1 (+13 approach)
Design loadHL 93
Structure length2,094 ft (638.3 m)
Longest span250 ft (76.2 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic207,900 (2019)
Projected traffic1 by 1900
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was N IH 35 on Ramp over UPRR & Mcneil RD built?

It was built in 2018, making it 7 years old in 2025.

What condition is N IH 35 on Ramp over UPRR & Mcneil RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does N IH 35 on Ramp over UPRR & Mcneil RD carry?

About 207,900 vehicles per day (2019 count).

How long is N IH 35 on Ramp over UPRR & Mcneil RD?

The structure is 2,094 ft (638.3 m) long with a longest span of 250 ft (76.2 m) and a deck 26 ft wide.

Who owns N IH 35 on Ramp over UPRR & Mcneil RD?

It is owned by the State Highway Agency.