Lopez RD (cr 200) over West Main Drain
FairWillacy County, Texas · 0.25 MI N of JCT FM 1761 · Structure no. 212450AA0152002
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 91 ft
- 3 main spans
- Daily traffic
- 113
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Lopez RD (cr 200) over West Main Drain is a concrete stringer/multi-beam or girder carrying Lopez RD (cr 200) over West Main Drain in Willacy County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 113 vehicles a day, roughly 3% of them trucks, projected to reach 38 by 2042. The structure is 91 ft (27.7 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lopez RD (cr 200) over West Main Drain built?
It was built in 1975, making it 50 years old in 2025.
What condition is Lopez RD (cr 200) over West Main Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Lopez RD (cr 200) over West Main Drain carry?
About 113 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is Lopez RD (cr 200) over West Main Drain?
The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.
Who owns Lopez RD (cr 200) over West Main Drain?
It is owned by the County Highway Agency.