US Bridges

FM 392 over Draw

Good

Wilbarger County, Texas · 0.9 MI W of FM 925 · Structure no. 032440083202168

Built
2024
1 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
34 ft
4 main spans
Daily traffic
418
2020 count
Owner
State
State Highway Agency

About this bridge

FM 392 over Draw is a concrete culvert carrying FM 392 over Draw in Wilbarger County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 418 vehicles a day, roughly 6% of them trucks, projected to reach 585 by 2040. The structure is 34 ft (10.3 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFM 392
CrossesDraw
Location0.9 MI W of FM 925
RouteState Highway 392
StateTexas
Coordinates34.16441, -99.46996
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length34 ft (10.3 m)
Longest span8 ft (2.4 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic418 (2020)
Projected traffic585 by 2040
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 392 over Draw built?

It was built in 2024, making it 1 years old in 2025.

What condition is FM 392 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does FM 392 over Draw carry?

About 418 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is FM 392 over Draw?

The structure is 34 ft (10.3 m) long with a longest span of 8 ft (2.4 m) and a deck 30 ft wide.

Who owns FM 392 over Draw?

It is owned by the State Highway Agency.