US Bridges

Deville-Cortez ST over Plum Creek

Good

Wichita County, Texas · 0.04 MI W of Tanbark RD · Structure no. 032430B01572001

Built
2009
16 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
28 ft
3 main spans
Daily traffic
306
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Deville-Cortez ST over Plum Creek is a concrete culvert carrying Deville-Cortez ST over Plum Creek in Wichita County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 306 vehicles a day, roughly 3% of them trucks, projected to reach 306 by 2042. The structure is 28 ft (8.6 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDeville-Cortez ST
CrossesPlum Creek
Location0.04 MI W of Tanbark RD
RouteCity Street 0
StateTexas
Coordinates33.94172, -98.54547
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length28 ft (8.6 m)
Longest span9 ft (2.7 m)
Deck width36 ft (10.9 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic306 (2022)
Projected traffic306 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Deville-Cortez ST over Plum Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is Deville-Cortez ST over Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Deville-Cortez ST over Plum Creek carry?

About 306 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Deville-Cortez ST over Plum Creek?

The structure is 28 ft (8.6 m) long with a longest span of 9 ft (2.7 m) and a deck 36 ft wide.

Who owns Deville-Cortez ST over Plum Creek?

It is owned by the City or Municipal Highway Agency.