CR260/FULFER Road over South Side Canal
FairPosted for loadWichita County, Texas · 1.20 MI S of SH 258 · Structure no. 032430AA0260001
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected November 2024
- Type
- Other
- Prestressed Concrete
- Length
- 53 ft
- 3 main spans
- Daily traffic
- 13
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR260/FULFER Road over South Side Canal is a prestressed concrete other carrying CR260/FULFER Road over South Side Canal in Wichita County, Texas. It was built in 1950, so it is 75 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 13 vehicles a day, projected to reach 60 by 2030. The structure is 53 ft (16.2 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR260/FULFER Road over South Side Canal built?
It was built in 1950, making it 75 years old in 2025.
What condition is CR260/FULFER Road over South Side Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does CR260/FULFER Road over South Side Canal carry?
About 13 vehicles per day (2020 count).
How long is CR260/FULFER Road over South Side Canal?
The structure is 53 ft (16.2 m) long with a longest span of 17 ft (5.2 m) and a deck 20 ft wide.
Who owns CR260/FULFER Road over South Side Canal?
It is owned by the County Highway Agency.