Spur 447WB Exit Rp over Barwise ST (closed)
FairWichita County, Texas · 0.2 MI N of Bus 287J · Structure no. 032430015612069
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected June 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 419 ft
- 4 main spans
- Daily traffic
- 697
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Spur 447WB Exit Rp over Barwise ST (closed) is a prestressed concrete stringer/multi-beam or girder carrying Spur 447WB Exit Rp over Barwise ST (closed) in Wichita County, Texas. It was built in 1979, so it is 46 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 697 vehicles a day, roughly 2% of them trucks, projected to reach 820 by 2033. The structure is 419 ft (127.7 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Spur 447WB Exit Rp over Barwise ST (closed) built?
It was built in 1979, making it 46 years old in 2025.
What condition is Spur 447WB Exit Rp over Barwise ST (closed) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2022.
How much traffic does Spur 447WB Exit Rp over Barwise ST (closed) carry?
About 697 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is Spur 447WB Exit Rp over Barwise ST (closed)?
The structure is 419 ft (127.7 m) long with a longest span of 95 ft (29 m) and a deck 32 ft wide.
Who owns Spur 447WB Exit Rp over Barwise ST (closed)?
It is owned by the State Highway Agency.