US 82 Eb/Us 277 NB over Fairway Blvd
GoodWichita County, Texas · 4.2 MI W of US 287 · Structure no. 032430015604102
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected May 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 244 ft
- 1 main span
- Daily traffic
- 14,190
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
US 82 Eb/Us 277 NB over Fairway Blvd is a prestressed concrete stringer/multi-beam or girder carrying US 82 Eb/Us 277 NB over Fairway Blvd in Wichita County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,190 vehicles a day, roughly 14% of them trucks, projected to reach 19,870 by 2033. The structure is 244 ft (74.4 m) long and 58 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 82 Eb/Us 277 NB over Fairway Blvd built?
It was built in 2003, making it 22 years old in 2025.
What condition is US 82 Eb/Us 277 NB over Fairway Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.
How much traffic does US 82 Eb/Us 277 NB over Fairway Blvd carry?
About 14,190 vehicles per day (2013 count), of which roughly 14% are trucks.
How long is US 82 Eb/Us 277 NB over Fairway Blvd?
The structure is 244 ft (74.4 m) long with a longest span of 120 ft (36.6 m) and a deck 58 ft wide.
Who owns US 82 Eb/Us 277 NB over Fairway Blvd?
It is owned by the State Highway Agency.