US Bridges

IH 44 SB over Wichita River

Good

Wichita County, Texas · 1.0 MI S of B287J/LP 370 · Structure no. 032430004309202

Built
2001
24 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
424 ft
1 main span
Daily traffic
34,390
2019 count
Owner
State
State Highway Agency

About this bridge

IH 44 SB over Wichita River is a steel continuous stringer/multi-beam or girder carrying IH 44 SB over Wichita River in Wichita County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,390 vehicles a day, roughly 10% of them trucks, projected to reach 42,630 by 2030. The structure is 424 ft (129.2 m) long and 73 ft wide.

CarriesIH 44 SB
CrossesWichita River
Location1.0 MI S of B287J/LP 370
RouteInterstate 44
StateTexas
Coordinates33.91394, -98.50625
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating37 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans1 (+7 approach)
Design loadHS 20
Structure length424 ft (129.2 m)
Longest span100 ft (30.5 m)
Deck width73 ft (22.4 m)
Roadway width67 ft (20.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,390 (2019)
Projected traffic42,630 by 2030
Trucks10%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 44 SB over Wichita River built?

It was built in 2001, making it 24 years old in 2025.

What condition is IH 44 SB over Wichita River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does IH 44 SB over Wichita River carry?

About 34,390 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is IH 44 SB over Wichita River?

The structure is 424 ft (129.2 m) long with a longest span of 100 ft (30.5 m) and a deck 73 ft wide.

Who owns IH 44 SB over Wichita River?

It is owned by the State Highway Agency.