FM 2697 over Salt Creek
FairWheeler County, Texas · 0.65 MI E of FM 592 · Structure no. 252420263201001
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 90 ft
- 3 main spans
- Daily traffic
- 1,350
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
FM 2697 over Salt Creek is a concrete stringer/multi-beam or girder carrying FM 2697 over Salt Creek in Wheeler County, Texas. It was built in 1962, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,350 vehicles a day, roughly 11% of them trucks, projected to reach 1,900 by 2033. The structure is 90 ft (27.4 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 2697 over Salt Creek built?
It was built in 1962, making it 63 years old in 2025.
What condition is FM 2697 over Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does FM 2697 over Salt Creek carry?
About 1,350 vehicles per day (2013 count), of which roughly 11% are trucks.
How long is FM 2697 over Salt Creek?
The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.
Who owns FM 2697 over Salt Creek?
It is owned by the State Highway Agency.