US Bridges

CO RD 403 over Juanita Creek

Good

Wharton County, Texas · 0.8 MI W of SH 71 · Structure no. 132410AA0403004

Built
2018
7 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
1 main span
Daily traffic
49
2022 count
Owner
County
County Highway Agency

About this bridge

CO RD 403 over Juanita Creek is a steel stringer/multi-beam or girder carrying CO RD 403 over Juanita Creek in Wharton County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, roughly 3% of them trucks, projected to reach 87 by 2042. The structure is 60 ft (18.3 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCO RD 403
CrossesJuanita Creek
Location0.8 MI W of SH 71
RouteCounty Highway 403
StateTexas
Coordinates29.02811, -96.22232
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length60 ft (18.3 m)
Longest span60 ft (18.3 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2022)
Projected traffic87 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD 403 over Juanita Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is CO RD 403 over Juanita Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CO RD 403 over Juanita Creek carry?

About 49 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is CO RD 403 over Juanita Creek?

The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 28 ft wide.

Who owns CO RD 403 over Juanita Creek?

It is owned by the County Highway Agency.