CR 268 over Draw
PoorPosted for loadWharton County, Texas · 3.40 MI W of SH 60 · Structure no. 132410AA0356004
- Built
- 1995
- 30 years old
- Condition
- Poor
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 49 ft
- 2 main spans
- Daily traffic
- 70
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
CR 268 over Draw is a wood or timber stringer/multi-beam or girder carrying CR 268 over Draw in Wharton County, Texas. It was built in 1995, so it is 30 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 70 vehicles a day, projected to reach 200 by 2028. The structure is 49 ft (14.9 m) long and 24 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 268 over Draw built?
It was built in 1995, making it 30 years old in 2025.
What condition is CR 268 over Draw in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2024.
How much traffic does CR 268 over Draw carry?
About 70 vehicles per day (2010 count).
How long is CR 268 over Draw?
The structure is 49 ft (14.9 m) long with a longest span of 24 ft (7.3 m) and a deck 24 ft wide.
Who owns CR 268 over Draw?
It is owned by the County Highway Agency.