US Bridges

FM 1300 over Goldenrod Creek

Fair

Wharton County, Texas · 0.45 MI E of Jackson C/L · Structure no. 132410042010010

Built
1960
65 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
91 ft
3 main spans
Daily traffic
413
2020 count
Owner
State
State Highway Agency

About this bridge

FM 1300 over Goldenrod Creek is a concrete stringer/multi-beam or girder carrying FM 1300 over Goldenrod Creek in Wharton County, Texas. It was built in 1960, so it is 65 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 413 vehicles a day, roughly 4% of them trucks, projected to reach 490 by 2033. The structure is 91 ft (27.7 m) long and 25 ft wide. If it were closed, the detour would be 24.2 mi (39 km).

CarriesFM 1300
CrossesGoldenrod Creek
Location0.45 MI E of Jackson C/L
RouteState Highway 1300
StateTexas
Coordinates29.22775, -96.60679
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating56 US tons
Inventory rating33 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadH 15
Structure length91 ft (27.7 m)
Longest span30 ft (9.1 m)
Deck width25 ft (7.5 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic413 (2020)
Projected traffic490 by 2033
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.2 mi (39 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$5,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 1300 over Goldenrod Creek built?

It was built in 1960, making it 65 years old in 2025.

What condition is FM 1300 over Goldenrod Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does FM 1300 over Goldenrod Creek carry?

About 413 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is FM 1300 over Goldenrod Creek?

The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.

Who owns FM 1300 over Goldenrod Creek?

It is owned by the State Highway Agency.