US Bridges

US 59 SB over Colorado River N Relief

Fair

Wharton County, Texas · 0.75 MI S of FM 102 · Structure no. 132410008907130

Built
1972
53 years old
Condition
Fair
inspected January 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
214 ft
5 main spans
Daily traffic
16,168
2024 count
Owner
State
State Highway Agency

About this bridge

US 59 SB over Colorado River N Relief is a concrete stringer/multi-beam or girder carrying US 59 SB over Colorado River N Relief in Wharton County, Texas. It was built in 1972, so it is 53 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 16,168 vehicles a day, roughly 23% of them trucks, projected to reach 20,018 by 2041. The structure is 214 ft (65.2 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 59 SB
CrossesColorado River N Relief
Location0.75 MI S of FM 102
RouteU.S. Route 59
StateTexas
Coordinates29.31618, -96.12482
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length214 ft (65.2 m)
Longest span43 ft (13.1 m)
Deck width44 ft (13.5 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,168 (2024)
Projected traffic20,018 by 2041
Trucks23%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 59 SB over Colorado River N Relief built?

It was built in 1972, making it 53 years old in 2025.

What condition is US 59 SB over Colorado River N Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does US 59 SB over Colorado River N Relief carry?

About 16,168 vehicles per day (2024 count), of which roughly 23% are trucks.

How long is US 59 SB over Colorado River N Relief?

The structure is 214 ft (65.2 m) long with a longest span of 43 ft (13.1 m) and a deck 44 ft wide.

Who owns US 59 SB over Colorado River N Relief?

It is owned by the State Highway Agency.