SP 400 over Chacon Creek
GoodWebb County, Texas · 0.40 MI W of Lp 20 · Structure no. 222400354301001
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 270 ft
- 4 main spans
- Daily traffic
- 20,937
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SP 400 over Chacon Creek is a prestressed concrete stringer/multi-beam or girder carrying SP 400 over Chacon Creek in Webb County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,937 vehicles a day, roughly 9% of them trucks, projected to reach 24,110 by 2033. The structure is 270 ft (82.3 m) long and 86 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SP 400 over Chacon Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is SP 400 over Chacon Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.
How much traffic does SP 400 over Chacon Creek carry?
About 20,937 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is SP 400 over Chacon Creek?
The structure is 270 ft (82.3 m) long with a longest span of 68 ft (20.7 m) and a deck 86 ft wide.
Who owns SP 400 over Chacon Creek?
It is owned by the State Highway Agency.