Hohenwald Schoolrd over Indian Creek
FairWashington County, Texas · 0.1 MI SE Old Mill Crk RD · Structure no. 172390AA0403001
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 91 ft
- 3 main spans
- Daily traffic
- 30
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Hohenwald Schoolrd over Indian Creek is a concrete stringer/multi-beam or girder carrying Hohenwald Schoolrd over Indian Creek in Washington County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 30 vehicles a day, roughly 3% of them trucks, projected to reach 114 by 2042. The structure is 91 ft (27.7 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hohenwald Schoolrd over Indian Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is Hohenwald Schoolrd over Indian Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Hohenwald Schoolrd over Indian Creek carry?
About 30 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Hohenwald Schoolrd over Indian Creek?
The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 26 ft wide.
Who owns Hohenwald Schoolrd over Indian Creek?
It is owned by the County Highway Agency.