US Bridges

Hohenwald Schoolrd over Indian Creek

Fair

Washington County, Texas · 0.1 MI SE Old Mill Crk RD · Structure no. 172390AA0403001

Built
2004
21 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
91 ft
3 main spans
Daily traffic
30
2022 count
Owner
County
County Highway Agency

About this bridge

Hohenwald Schoolrd over Indian Creek is a concrete stringer/multi-beam or girder carrying Hohenwald Schoolrd over Indian Creek in Washington County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30 vehicles a day, roughly 3% of them trucks, projected to reach 114 by 2042. The structure is 91 ft (27.7 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesHohenwald Schoolrd
CrossesIndian Creek
Location0.1 MI SE Old Mill Crk RD
RouteCounty Highway 0
StateTexas
Coordinates30.15855, -96.54393
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length91 ft (27.7 m)
Longest span30 ft (9.1 m)
Deck width26 ft (7.8 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic114 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hohenwald Schoolrd over Indian Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is Hohenwald Schoolrd over Indian Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Hohenwald Schoolrd over Indian Creek carry?

About 30 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Hohenwald Schoolrd over Indian Creek?

The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 26 ft wide.

Who owns Hohenwald Schoolrd over Indian Creek?

It is owned by the County Highway Agency.