SH 105 over Draw
FairWashington County, Texas · 0.37 MI E of FM 50 · Structure no. 172390031507076
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected February 2024
- Type
- Culvert
- Concrete
- Length
- 29 ft
- 3 main spans
- Daily traffic
- 8,054
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 105 over Draw is a concrete culvert carrying SH 105 over Draw in Washington County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,054 vehicles a day, roughly 12% of them trucks, projected to reach 8,680 by 2033. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 105 over Draw built?
It was built in 2000, making it 25 years old in 2025.
What condition is SH 105 over Draw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does SH 105 over Draw carry?
About 8,054 vehicles per day (2020 count), of which roughly 12% are trucks.
How long is SH 105 over Draw?
The structure is 29 ft (8.8 m) long with a longest span of 6 ft (1.8 m).
Who owns SH 105 over Draw?
It is owned by the State Highway Agency.