US Bridges

SH19 DC-IH45 Sbfr over Row

Good

Walker County, Texas · 1.18 MI S of SH 75 · Structure no. 172360067507266

Built
2019
6 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
130 ft
1 main span
Daily traffic
11,167
2020 count
Owner
State
State Highway Agency

About this bridge

SH19 DC-IH45 Sbfr over Row is a prestressed concrete stringer/multi-beam or girder carrying SH19 DC-IH45 Sbfr over Row in Walker County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,167 vehicles a day, roughly 8% of them trucks, projected to reach 15,634 by 2040. The structure is 130 ft (39.6 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH19 DC-IH45 Sbfr
CrossesRow
Location1.18 MI S of SH 75
RouteState Highway 19
StateTexas
Coordinates30.67978, -95.52657
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length130 ft (39.6 m)
Longest span130 ft (39.6 m)
Deck width29 ft (8.8 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,167 (2020)
Projected traffic15,634 by 2040
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH19 DC-IH45 Sbfr over Row built?

It was built in 2019, making it 6 years old in 2025.

What condition is SH19 DC-IH45 Sbfr over Row in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does SH19 DC-IH45 Sbfr over Row carry?

About 11,167 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is SH19 DC-IH45 Sbfr over Row?

The structure is 130 ft (39.6 m) long with a longest span of 130 ft (39.6 m) and a deck 29 ft wide.

Who owns SH19 DC-IH45 Sbfr over Row?

It is owned by the State Highway Agency.