US Bridges

Airline DR over Lone Tree Creek Relief

Good

Victoria County, Texas · 1.05 MI SW of Lp 463 · Structure no. 132350B00003003

Built
2009
16 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
89 ft
4 main spans
Daily traffic
9,467
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Airline DR over Lone Tree Creek Relief is a concrete culvert carrying Airline DR over Lone Tree Creek Relief in Victoria County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,467 vehicles a day, roughly 4% of them trucks, projected to reach 13,254 by 2042. The structure is 89 ft (27.1 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAirline DR
CrossesLone Tree Creek Relief
Location1.05 MI SW of Lp 463
RouteCity Street 0
StateTexas
Coordinates28.82809, -96.96669
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length89 ft (27.1 m)
Longest span10 ft (3 m)
Deck width78 ft (23.7 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,467 (2022)
Projected traffic13,254 by 2042
Trucks4%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Airline DR over Lone Tree Creek Relief built?

It was built in 2009, making it 16 years old in 2025.

What condition is Airline DR over Lone Tree Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Airline DR over Lone Tree Creek Relief carry?

About 9,467 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Airline DR over Lone Tree Creek Relief?

The structure is 89 ft (27.1 m) long with a longest span of 10 ft (3 m) and a deck 78 ft wide.

Who owns Airline DR over Lone Tree Creek Relief?

It is owned by the City or Municipal Highway Agency.