US Bridges

Parsifal ST over Draw

Fair

Victoria County, Texas · 0.1 MI SE of Parsifal RD · Structure no. 132350AA0367001

Built
1968
57 years old
Condition
Fair
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
68
2022 count
Owner
County
County Highway Agency

About this bridge

Parsifal ST over Draw is a prestressed concrete box beam or girders - multiple carrying Parsifal ST over Draw in Victoria County, Texas. It was built in 1968, so it is 57 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 68 vehicles a day, roughly 3% of them trucks, projected to reach 251 by 2042. The structure is 40 ft (12.2 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesParsifal ST
CrossesDraw
Location0.1 MI SE of Parsifal RD
RouteCounty Highway 0
StateTexas
Coordinates28.78413, -97.03328
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadUnknown
Structure length40 ft (12.2 m)
Longest span37 ft (11.3 m)
Deck width24 ft (7.4 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic68 (2022)
Projected traffic251 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Parsifal ST over Draw built?

It was built in 1968, making it 57 years old in 2025.

What condition is Parsifal ST over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Parsifal ST over Draw carry?

About 68 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Parsifal ST over Draw?

The structure is 40 ft (12.2 m) long with a longest span of 37 ft (11.3 m) and a deck 24 ft wide.

Who owns Parsifal ST over Draw?

It is owned by the County Highway Agency.