US 77 NB over Garcitas Creek Relief
GoodVictoria County, Texas · 6.6 MI N of Loop 463 · Structure no. 132350037004042
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 112 ft
- 2 main spans
- Daily traffic
- 3,389
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 77 NB over Garcitas Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying US 77 NB over Garcitas Creek Relief in Victoria County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,389 vehicles a day, roughly 13% of them trucks, projected to reach 5,760 by 2033. The structure is 112 ft (34.1 m) long and 40 ft wide. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 77 NB over Garcitas Creek Relief built?
It was built in 2004, making it 21 years old in 2025.
What condition is US 77 NB over Garcitas Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does US 77 NB over Garcitas Creek Relief carry?
About 3,389 vehicles per day (2020 count), of which roughly 13% are trucks.
How long is US 77 NB over Garcitas Creek Relief?
The structure is 112 ft (34.1 m) long with a longest span of 56 ft (17.1 m) and a deck 40 ft wide.
Who owns US 77 NB over Garcitas Creek Relief?
It is owned by the State Highway Agency.