Taini Ave over San Felipe Creek
GoodVal Verde County, Texas · 0.4 MI S of Garfield Ave · Structure no. 222330B01405005
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 1,256
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Taini Ave over San Felipe Creek is a prestressed concrete box beam or girders - multiple carrying Taini Ave over San Felipe Creek in Val Verde County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,256 vehicles a day, roughly 5% of them trucks, projected to reach 9,500 by 2033. The structure is 58 ft (17.7 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Taini Ave over San Felipe Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is Taini Ave over San Felipe Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Taini Ave over San Felipe Creek carry?
About 1,256 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Taini Ave over San Felipe Creek?
The structure is 58 ft (17.7 m) long with a longest span of 55 ft (16.8 m) and a deck 42 ft wide.
Who owns Taini Ave over San Felipe Creek?
It is owned by the City or Municipal Highway Agency.