US 277 over San Felipe Creek
FairVal Verde County, Texas · 0.25 MI SE of US 90 · Structure no. 222330029901041
- Built
- 1955
- 70 years old, rebuilt 1985
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 336 ft
- 11 main spans
- Daily traffic
- 18,473
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 277 over San Felipe Creek is a concrete stringer/multi-beam or girder carrying US 277 over San Felipe Creek in Val Verde County, Texas. It was built in 1955 and reconstructed in 1985, so it is 70 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,473 vehicles a day, roughly 4% of them trucks, projected to reach 22,907 by 2042. The structure is 336 ft (102.4 m) long and 92 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 277 over San Felipe Creek built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1985.
What condition is US 277 over San Felipe Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does US 277 over San Felipe Creek carry?
About 18,473 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is US 277 over San Felipe Creek?
The structure is 336 ft (102.4 m) long with a longest span of 30 ft (9.1 m) and a deck 92 ft wide.
Who owns US 277 over San Felipe Creek?
It is owned by the State Highway Agency.