US Bridges

US 271 over Lilly Creek Relief

Fair

Upshur County, Texas · 6.15 MI N of SH 154 · Structure no. 192300024804028

Built
1956
69 years old, rebuilt 1981
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
212 ft
7 main spans
Daily traffic
7,222
2020 count
Owner
State
State Highway Agency

About this bridge

US 271 over Lilly Creek Relief is a concrete stringer/multi-beam or girder carrying US 271 over Lilly Creek Relief in Upshur County, Texas. It was built in 1956 and reconstructed in 1981, so it is 69 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,222 vehicles a day, roughly 16% of them trucks, projected to reach 8,770 by 2033. The structure is 212 ft (64.6 m) long and 70 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesUS 271
CrossesLilly Creek Relief
Location6.15 MI N of SH 154
RouteU.S. Route 271
StateTexas
Coordinates32.8161, -94.95256
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans7
Design loadH 20
Structure length212 ft (64.6 m)
Longest span30 ft (9.1 m)
Deck width70 ft (21.3 m)
Roadway width68 ft (20.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,222 (2020)
Projected traffic8,770 by 2033
Trucks16%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 271 over Lilly Creek Relief built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1981.

What condition is US 271 over Lilly Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does US 271 over Lilly Creek Relief carry?

About 7,222 vehicles per day (2020 count), of which roughly 16% are trucks.

How long is US 271 over Lilly Creek Relief?

The structure is 212 ft (64.6 m) long with a longest span of 30 ft (9.1 m) and a deck 70 ft wide.

Who owns US 271 over Lilly Creek Relief?

It is owned by the State Highway Agency.