US Bridges

FM 256 over Belt Creek

Good

Tyler County, Texas · 3.00 MI SW of US 69 · Structure no. 202290087703023

Built
2019
6 years old
Condition
Good
inspected July 2024
Type
Slab
Prestressed Concrete
Length
60 ft
2 main spans
Daily traffic
526
2022 count
Owner
State
State Highway Agency

About this bridge

FM 256 over Belt Creek is a prestressed concrete slab carrying FM 256 over Belt Creek in Tyler County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 526 vehicles a day, roughly 15% of them trucks, projected to reach 789 by 2042. The structure is 60 ft (18.3 m) long and 32 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesFM 256
CrossesBelt Creek
Location3.00 MI SW of US 69
RouteState Highway 256
StateTexas
Coordinates30.88626, -94.46096
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span30 ft (9.1 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic526 (2022)
Projected traffic789 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 256 over Belt Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is FM 256 over Belt Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does FM 256 over Belt Creek carry?

About 526 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is FM 256 over Belt Creek?

The structure is 60 ft (18.3 m) long with a longest span of 30 ft (9.1 m) and a deck 32 ft wide.

Who owns FM 256 over Belt Creek?

It is owned by the State Highway Agency.