US Bridges

FM 256 over Wolf Creek Relief

Good

Tyler County, Texas · 1.50 MI NW of US 190 · Structure no. 202290070303017

Built
1955
70 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
23 ft
3 main spans
Daily traffic
485
2024 count
Owner
State
State Highway Agency

About this bridge

FM 256 over Wolf Creek Relief is a concrete culvert carrying FM 256 over Wolf Creek Relief in Tyler County, Texas. It was built in 1955, so it is 70 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 485 vehicles a day, roughly 14% of them trucks, projected to reach 654 by 2042. The structure is 23 ft (7 m) long and 35 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesFM 256
CrossesWolf Creek Relief
Location1.50 MI NW of US 190
RouteState Highway 256
StateTexas
Coordinates30.86354, -94.26952
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadOther
Structure length23 ft (7 m)
Longest span7 ft (2.1 m)
Deck width35 ft (10.8 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic485 (2024)
Projected traffic654 by 2042
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$1,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 256 over Wolf Creek Relief built?

It was built in 1955, making it 70 years old in 2025.

What condition is FM 256 over Wolf Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does FM 256 over Wolf Creek Relief carry?

About 485 vehicles per day (2024 count), of which roughly 14% are trucks.

How long is FM 256 over Wolf Creek Relief?

The structure is 23 ft (7 m) long with a longest span of 7 ft (2.1 m) and a deck 35 ft wide.

Who owns FM 256 over Wolf Creek Relief?

It is owned by the State Highway Agency.