FM 2262 over Sandy Creek

Good

Trinity County, Texas · 1.50 MI SE of FM 2501 · Structure no. 112280238702003

Built
1969
56 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
120 ft
3 main spans
Daily traffic
204
2020 count
Owner
State
State Highway Agency

About this bridge

FM 2262 over Sandy Creek is a concrete stringer/multi-beam or girder carrying FM 2262 over Sandy Creek in Trinity County, Texas. It was built in 1969, so it is 56 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 204 vehicles a day, roughly 14% of them trucks, projected to reach 300 by 2033. The structure is 120 ft (36.6 m) long and 26 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesFM 2262
CrossesSandy Creek
Location1.50 MI SE of FM 2501
RouteState Highway 2262
StateTexas
Coordinates31.2024, -94.89352
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width26 ft (7.9 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic204 (2020)
Projected traffic300 by 2033
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2262 over Sandy Creek built?

It was built in 1969, making it 56 years old in 2025.

What condition is FM 2262 over Sandy Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does FM 2262 over Sandy Creek carry?

About 204 vehicles per day (2020 count), of which roughly 14% are trucks.

How long is FM 2262 over Sandy Creek?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 26 ft wide.

Who owns FM 2262 over Sandy Creek?

It is owned by the State Highway Agency.