SH 19 NB over Trinity River Relief
GoodTrinity County, Texas · 0.75 MI N of Walker C/L · Structure no. 112280010908049
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 960 ft
- 8 main spans
- Daily traffic
- 4,207
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 19 NB over Trinity River Relief is a prestressed concrete stringer/multi-beam or girder carrying SH 19 NB over Trinity River Relief in Trinity County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,207 vehicles a day, roughly 14% of them trucks, projected to reach 5,850 by 2033. The structure is 960 ft (292.6 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 19 NB over Trinity River Relief built?
It was built in 2003, making it 22 years old in 2025.
What condition is SH 19 NB over Trinity River Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does SH 19 NB over Trinity River Relief carry?
About 4,207 vehicles per day (2020 count), of which roughly 14% are trucks.
How long is SH 19 NB over Trinity River Relief?
The structure is 960 ft (292.6 m) long with a longest span of 120 ft (36.6 m) and a deck 39 ft wide.
Who owns SH 19 NB over Trinity River Relief?
It is owned by the State Highway Agency.