US Bridges

Manana ST over Turkey Creek

Good

Travis County, Texas · 0.50 MI SW of Pearce RD · Structure no. 142270B07653001

Built
2016
9 years old
Condition
Good
inspected May 2024
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
24 ft
1 main span
Daily traffic
211
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Manana ST over Turkey Creek is a aluminum, wrought iron, or cast iron culvert carrying Manana ST over Turkey Creek in Travis County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 211 vehicles a day, roughly 3% of them trucks, projected to reach 345 by 2038. The structure is 24 ft (7.4 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesManana ST
CrossesTurkey Creek
Location0.50 MI SW of Pearce RD
RouteCity Street 0
StateTexas
Coordinates30.32601, -97.83287
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans1
Design loadHS 20
Structure length24 ft (7.4 m)
Longest span24 ft (7.4 m)
Deck width25 ft (7.6 m)
Roadway width21 ft (6.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic211 (2020)
Projected traffic345 by 2038
Trucks3%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Manana ST over Turkey Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is Manana ST over Turkey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Manana ST over Turkey Creek carry?

About 211 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Manana ST over Turkey Creek?

The structure is 24 ft (7.4 m) long with a longest span of 24 ft (7.4 m) and a deck 25 ft wide.

Who owns Manana ST over Turkey Creek?

It is owned by the City or Municipal Highway Agency.