US Bridges

Beckett RD over Draw

Good

Travis County, Texas · 0.05 MI SW of Wm Cannon · Structure no. 142270B05795001

Built
1990
35 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
3,973
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Beckett RD over Draw is a concrete culvert carrying Beckett RD over Draw in Travis County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,973 vehicles a day, projected to reach 4,290 by 2034. The structure is 32 ft (9.8 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBeckett RD
CrossesDraw
Location0.05 MI SW of Wm Cannon
RouteCity Street 0
StateTexas
Coordinates30.22469, -97.85521
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width70 ft (21.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,973 (2020)
Projected traffic4,290 by 2034
Trucks0%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$4,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Beckett RD over Draw built?

It was built in 1990, making it 35 years old in 2025.

What condition is Beckett RD over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Beckett RD over Draw carry?

About 3,973 vehicles per day (2020 count).

How long is Beckett RD over Draw?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 70 ft wide.

Who owns Beckett RD over Draw?

It is owned by the City or Municipal Highway Agency.