US Bridges

E Stassney Lane over Draw

Good

Travis County, Texas · 2.2 MI SE of IH 35 · Structure no. 142270B03845008

Built
1998
27 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
48 ft
1 main span
Daily traffic
11,964
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

E Stassney Lane over Draw is a prestressed concrete stringer/multi-beam or girder carrying E Stassney Lane over Draw in Travis County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,964 vehicles a day, projected to reach 27,200 by 2030. The structure is 48 ft (14.6 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE Stassney Lane
CrossesDraw
Location2.2 MI SE of IH 35
RouteCity Street 0
StateTexas
Coordinates30.19236, -97.72927
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length48 ft (14.6 m)
Longest span46 ft (14 m)
Deck width76 ft (23.2 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,964 (2023)
Projected traffic27,200 by 2030
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$6,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E Stassney Lane over Draw built?

It was built in 1998, making it 27 years old in 2025.

What condition is E Stassney Lane over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does E Stassney Lane over Draw carry?

About 11,964 vehicles per day (2023 count).

How long is E Stassney Lane over Draw?

The structure is 48 ft (14.6 m) long with a longest span of 46 ft (14 m) and a deck 76 ft wide.

Who owns E Stassney Lane over Draw?

It is owned by the City or Municipal Highway Agency.