US Bridges

Pecos ST over Camp Mabry Draw

Good

Travis County, Texas · 0.05 MI S of W 35th ST · Structure no. 142270B01147001

Built
1977
48 years old
Condition
Good
inspected February 2024
Type
Slab
Concrete
Length
52 ft
2 main spans
Daily traffic
2,895
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pecos ST over Camp Mabry Draw is a concrete slab carrying Pecos ST over Camp Mabry Draw in Travis County, Texas. It was built in 1977, so it is 48 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,895 vehicles a day, projected to reach 3,180 by 2034. The structure is 52 ft (15.9 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPecos ST
CrossesCamp Mabry Draw
Location0.05 MI S of W 35th ST
RouteCity Street 0
StateTexas
Coordinates30.31281, -97.76726
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length52 ft (15.9 m)
Longest span25 ft (7.6 m)
Deck width54 ft (16.5 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,895 (2020)
Projected traffic3,180 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pecos ST over Camp Mabry Draw built?

It was built in 1977, making it 48 years old in 2025.

What condition is Pecos ST over Camp Mabry Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Pecos ST over Camp Mabry Draw carry?

About 2,895 vehicles per day (2020 count).

How long is Pecos ST over Camp Mabry Draw?

The structure is 52 ft (15.9 m) long with a longest span of 25 ft (7.6 m) and a deck 54 ft wide.

Who owns Pecos ST over Camp Mabry Draw?

It is owned by the City or Municipal Highway Agency.