US Bridges

Sun Chase Pkwy over Draw

Good

Travis County, Texas · 0.7 MI SW of Pierce LN · Structure no. 142270AA1871001

Built
2019
6 years old
Condition
Good
inspected March 2023
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
50
2022 count
Owner
County
County Highway Agency

About this bridge

Sun Chase Pkwy over Draw is a concrete culvert carrying Sun Chase Pkwy over Draw in Travis County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 3% of them trucks, projected to reach 500 by 2042. The structure is 23 ft (7 m) long.

CarriesSun Chase Pkwy
CrossesDraw
Location0.7 MI SW of Pierce LN
RouteCity Street 0
StateTexas
Coordinates30.1433, -97.59293
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length23 ft (7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic500 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sun Chase Pkwy over Draw built?

It was built in 2019, making it 6 years old in 2025.

What condition is Sun Chase Pkwy over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Sun Chase Pkwy over Draw carry?

About 50 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Sun Chase Pkwy over Draw?

The structure is 23 ft (7 m) long with a longest span of 10 ft (3 m).

Who owns Sun Chase Pkwy over Draw?

It is owned by the County Highway Agency.