Bois Darc Lane over Cottonwood Creek
FairTravis County, Texas · 0.10 MI S of Kimbro West · Structure no. 142270AA1536001
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 54 ft
- 1 main span
- Daily traffic
- 538
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Bois Darc Lane over Cottonwood Creek is a steel stringer/multi-beam or girder carrying Bois Darc Lane over Cottonwood Creek in Travis County, Texas. It was built in 1962, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 538 vehicles a day, roughly 3% of them trucks, projected to reach 200 by 2027. The structure is 54 ft (16.5 m) long and 25 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bois Darc Lane over Cottonwood Creek built?
It was built in 1962, making it 63 years old in 2025.
What condition is Bois Darc Lane over Cottonwood Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Bois Darc Lane over Cottonwood Creek carry?
About 538 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Bois Darc Lane over Cottonwood Creek?
The structure is 54 ft (16.5 m) long with a longest span of 31 ft (9.4 m) and a deck 25 ft wide.
Who owns Bois Darc Lane over Cottonwood Creek?
It is owned by the County Highway Agency.