Lp 1 SB over RM 2222 (northland Dr)
FairTravis County, Texas · 3.20 MI S of US 183 · Structure no. 142270313601042
- Built
- 1971
- 54 years old, rebuilt 2016
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 243 ft
- 2 main spans
- Daily traffic
- 80,588
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Lp 1 SB over RM 2222 (northland Dr) is a prestressed concrete stringer/multi-beam or girder carrying Lp 1 SB over RM 2222 (northland Dr) in Travis County, Texas. It was built in 1971 and reconstructed in 2016, so it is 54 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 80,588 vehicles a day, roughly 2% of them trucks, projected to reach 95,880 by 2033. The structure is 243 ft (74.1 m) long and 71 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lp 1 SB over RM 2222 (northland Dr) built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2016.
What condition is Lp 1 SB over RM 2222 (northland Dr) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Lp 1 SB over RM 2222 (northland Dr) carry?
About 80,588 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is Lp 1 SB over RM 2222 (northland Dr)?
The structure is 243 ft (74.1 m) long with a longest span of 86 ft (26.2 m) and a deck 71 ft wide.
Who owns Lp 1 SB over RM 2222 (northland Dr)?
It is owned by the State Highway Agency and maintained by the Local Toll Authority.