1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row)
GoodTravis County, Texas · 0.50 MI E of Lp 1 · Structure no. 142270313601037
- Built
- 1975
- 50 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 185 ft
- 1 main span
- Daily traffic
- 6,795
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row) is a prestressed concrete stringer/multi-beam or girder carrying 1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row) in Travis County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,795 vehicles a day, roughly 2% of them trucks, projected to reach 171,790 by 2036. The structure is 185 ft (56.4 m) long and 85 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row) built?
It was built in 1975, making it 50 years old in 2025.
What condition is 1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does 1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row) carry?
About 6,795 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is 1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row)?
The structure is 185 ft (56.4 m) long with a longest span of 80 ft (24.4 m) and a deck 85 ft wide.
Who owns 1st ST To/From LP1 over W 1st ST E Ta (lp 1 Row)?
It is owned by the State Highway Agency.