Lp 1 SB to SH 45SW over Lp 1 NB
GoodTravis County, Texas · At SH 45SW/ Lp 1 Intch · Structure no. 142270120006135
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 461 ft
- 4 main spans
- Daily traffic
- 6,781
- 2021 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Lp 1 SB to SH 45SW over Lp 1 NB is a prestressed concrete stringer/multi-beam or girder carrying Lp 1 SB to SH 45SW over Lp 1 NB in Travis County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,781 vehicles a day, roughly 3% of them trucks, projected to reach 10,172 by 2041. The structure is 461 ft (140.5 m) long and 40 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lp 1 SB to SH 45SW over Lp 1 NB built?
It was built in 2018, making it 7 years old in 2025.
What condition is Lp 1 SB to SH 45SW over Lp 1 NB in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Lp 1 SB to SH 45SW over Lp 1 NB carry?
About 6,781 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Lp 1 SB to SH 45SW over Lp 1 NB?
The structure is 461 ft (140.5 m) long with a longest span of 128 ft (39 m) and a deck 40 ft wide.
Who owns Lp 1 SB to SH 45SW over Lp 1 NB?
It is owned by the Local Toll Authority.