SH 45SE Wbml over Tributary of Rinard Crk
GoodTravis County, Texas · 0.64 MI E of IH 35 · Structure no. 142270120005040
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 230 ft
- 2 main spans
- Daily traffic
- 5,000
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
SH 45SE Wbml over Tributary of Rinard Crk is a prestressed concrete stringer/multi-beam or girder carrying SH 45SE Wbml over Tributary of Rinard Crk in Travis County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 13% of them trucks, projected to reach 7,899 by 2030. The structure is 230 ft (70.1 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 45SE Wbml over Tributary of Rinard Crk built?
It was built in 2008, making it 17 years old in 2025.
What condition is SH 45SE Wbml over Tributary of Rinard Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does SH 45SE Wbml over Tributary of Rinard Crk carry?
About 5,000 vehicles per day (2010 count), of which roughly 13% are trucks.
How long is SH 45SE Wbml over Tributary of Rinard Crk?
The structure is 230 ft (70.1 m) long with a longest span of 115 ft (35.1 m) and a deck 54 ft wide.
Who owns SH 45SE Wbml over Tributary of Rinard Crk?
It is owned by the State Highway Agency.