SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR
GoodTravis County, Texas · 3.75 MI N of SH 21 · Structure no. 142270044006262
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 4,731 ft
- 39 main spans
- Daily traffic
- 7,361
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR is a prestressed concrete stringer/multi-beam or girder carrying SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR in Travis County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,361 vehicles a day, roughly 15% of them trucks, projected to reach 21,860 by 2036. The structure is 4,731 ft (1,442 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR built?
It was built in 2011, making it 14 years old in 2025.
What condition is SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR carry?
About 7,361 vehicles per day (2016 count), of which roughly 15% are trucks.
How long is SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR?
The structure is 4,731 ft (1,442 m) long with a longest span of 136 ft (41.5 m) and a deck 32 ft wide.
Who owns SH 45EB - SH 130SB over US 183 SB / SH 130 SB FR?
It is owned by the State Highway Agency and maintained by the State Toll Authority.