US Bridges

SH 130 over Draw

Good

Travis County, Texas · 0.35 MI N of US 290 · Structure no. 142270044006081

Built
2006
19 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
45 ft
8 main spans
Daily traffic
11,500
2010 count
Owner
State
State Highway Agency

About this bridge

SH 130 over Draw is a concrete culvert carrying SH 130 over Draw in Travis County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,500 vehicles a day, roughly 15% of them trucks, projected to reach 41,000 by 2030. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSH 130
CrossesDraw
Location0.35 MI N of US 290
StateTexas
Coordinates30.34514, -97.59422
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans8
Design loadHS 20
Structure length45 ft (13.7 m)
Longest span5 ft (1.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck42 ft (12.7 m)

Traffic and service

Average daily traffic11,500 (2010)
Projected traffic41,000 by 2030
Trucks15%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 130 over Draw built?

It was built in 2006, making it 19 years old in 2025.

What condition is SH 130 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SH 130 over Draw carry?

About 11,500 vehicles per day (2010 count), of which roughly 15% are trucks.

How long is SH 130 over Draw?

The structure is 45 ft (13.7 m) long with a longest span of 5 ft (1.5 m).

Who owns SH 130 over Draw?

It is owned by the State Highway Agency.